Uni-Trend UT521 Specifikace Strana 1

Procházejte online nebo si stáhněte Specifikace pro Multimetry Uni-Trend UT521. Uni-Trend UT521 multimeter Uživatelská příručka

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 21
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 0
UT521 USERS MANUAL
1
Content
Chapter Page
2
5
6
9
10
11
18
1. Safety Instructions
2. Characteristics
3. General Specifications
4. Product outlook & accessories
5. Preparation before measurement
6. Measurement Operation
7. Maintenance & Repair
Zobrazit stránku 0
1 2 3 4 5 6 ... 20 21

Shrnutí obsahu

Strany 1 - Chapter Page

UT521 USERS MANUAL1ContentChapter Page25691011181. Safety Instructions2. Characteristics3. General Specifications4. Product outlook & accessories5

Strany 2 - 1.Safety Instructions

UT521 USERS MANUAL10Battery sign Battery Voltage 8.2V7.8V~8.2V7.4V~7.8V7.0V~7.4V 7V5.2 Test leads connection Make sure al

Strany 3

UT521 USERS MANUAL116. Measure method WarningWhen the Tester carry out earth resistance testing, the distancebetween E and C have the maximum v

Strany 4

UT521 USERS MANUAL12figure2C: auxiliary electrode P: potential electrode E: earth electrodeAuxiliaryEarth SpikesEarthed ElectrodeUnder TestRed

Strany 5 - 2.Characteristics

UT521 USERS MANUAL13b. Earth Voltage Testing:Select function OFF to EARTH VOLTAGE, LCD display will show voltage, connect test leads in V and E

Strany 6 - 3.General Specifications

UT521 USERS MANUAL14press"TEST"button, the button's light will be on, which shows the Tester is inmeasurement.(Note:when C or E does no

Strany 7 - 3.6 Storage condition:

UT521 USERS MANUAL15f. Hold function:while testing, press slightly"Hold/Save"button,save data function will be on, the corresponding t

Strany 8

UT521 USERS MANUAL166.2 Simple measurement(use simple 2-Wires test leads for measurement): This method will be used when the auxiliary earth st

Strany 9

UT521 USERS MANUAL17When using this method, P and C have already connected together.DangerWhen using commercial electricity power systemís grounding p

Strany 10

UT521 USERS MANUAL187. Maintenance & Repair7.1 Maintenance7.1.1 Replacing battery and repair(please see figure 4) After low battery indicatorshow,

Strany 11 - 6. Measure method

UT521 USERS MANUAL19 a. switch-off the Tester and remove all the test leads. b. release the screw in bottom part,and open battery compartment.

Strany 12 - UT521 USERS MANUAL

UT521 USERS MANUAL21.Safety InstructionsThis operation manual includes the user guidance and safety instruction when using the tester, please read it

Strany 13

UT521 USERS MANUAL20This operating manual is subject to change without notice.

Strany 14

UT521 USERS MANUAL21

Strany 15

UT521 USERS MANUAL3Danger identifies conditions and actions that most likely pose hazard(s) or die.Warning identifies conditi

Strany 16 - Under Test

UT521 USERS MANUAL4 Warning Do not use the Tester if it is damaged or metal part is exposed. Do not disassemble the tester un-intentionall

Strany 17

UT521 USERS MANUAL52.CharacteristicsThe Tester is using micro controller with high accuracy and reliability; it can measureevery electric wire, electr

Strany 18 - 7. Maintenance & Repair

UT521 USERS MANUAL63.General Specifications3.1 Operating temperature and Relative humidity(20 5 & 75%RH):3.2 Application standard: I

Strany 19 - 7.2 Repair

UT521 USERS MANUAL73.3 Measure methods: (1) Earth Voltage Testing:average respond (2) Earth Resistance Testing : testing signal frequency

Strany 20

UT521 USERS MANUAL83.7 Power source:[1.5V Alkaline Battery (AA)*6]3.8 Overload protection: Earth Resistance:200 Vac (10 seconds) E

Strany 21

UT521 USERS MANUAL94. Product outlook & accessories:(figure 1)figure 1LCD DisplayLIGHT/LOAD buttonHOLD/SAVE buttonTEST buttonON/OFF functionInput

Komentáře k této Příručce

Žádné komentáře